Download video (52-MB MP4)
- 100 Vestas V100 2-MW turbines
- Nearly 25,000 acres (101 km²)
- 22 miles of access roads
- Substation transformer: 262,000 pounds
- Substation increases voltage for transmission lines
- 17.1-mile 115-kV overhead transmission line from collection substation to interconnect substation
- More than 150 miles of underground cable in 50 miles of trench
- Tower base (platform) excavation depth: 9 feet
- 360 cubic yards of concrete, 28 tons of reinforcing steel
- Tower base (bottom third): 96,000 pounds, 128 anchor bolts
- Nacelle: 163,650 pounds
- Hub height: 262 feet
- Turbine blade: length 161 feet, weight 17,000 pounds
- Total height: 426 feet
- Blade diameter: 328 feet
- Blade sweep area: 1.94 acres
This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tags: Wind power, Wind energy