Go to multi-category search »

ISSUES/LOCATIONS

View titles only
(by date)
List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
RSS

Add NWW documents to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

News Watch

Selected Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Resource Documents by Xcel Energy

Xcel Energy
Construction of Xcel Energy’s Courtenay Wind Farm, North Dakota
Download video (52-MB MP4) 100 Vestas V100 2-MW turbines Nearly 25,000 acres (101 km²) 22 miles of access roads Substation transformer: 262,000 pounds Substation increases voltage for transmission lines 17.1-mile 115-kV overhead transmission line from collection substation to interconnect substation More than 150 miles of underground cable in 50 miles of trench Tower base (platform) excavation depth: 9 feet 360 cubic yards of concrete, 28 tons of reinforcing steel Tower base (bottom third): 96,000 pounds, 128 anchor bolts Nacelle: 163,650 . . . Complete article »

Also try:
Search all of documents for "Xcel Energy".
Search entire site for "Xcel Energy".

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: