[ exact phrase in "" ]

[ including uploaded files ]

ISSUES/LOCATIONS

View titles only
List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

RSS

Add NWW documents to your site (click here)

Resource Documents by Xcel Energy

Xcel Energy
Construction of Xcel Energy’s Courtenay Wind Farm, North Dakota 
Download video (52-MB MP4) 100 Vestas V100 2-MW turbines Nearly 25,000 acres (101 km²) 22 miles of access roads Substation transformer: 262,000 pounds Substation increases voltage for transmission lines 17.1-mile 115-kV overhead transmission line from collection substation to interconnect substation More than 150 miles of underground cable in 50 miles of trench Tower base (platform) excavation depth: 9 feet 360 cubic yards of concrete, 28 tons of reinforcing steel Tower base (bottom third): 96,000 pounds, 128 anchor bolts Nacelle: 163,650 pounds . . . Complete article »

Also try:
Search all of documents for "Xcel Energy".
Search entire site for "Xcel Energy".

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky