Wind Watch is a registered educational charity, founded in 2005. |
Sanders and Rosskopfs versus Bavaria Windpark
Translate: FROM English | TO English
Translate: FROM English | TO English
‘The defendant is ordered to cease operation of the wind power plant erected and operated on Plot no. 146 in the township of Ammerfeld, brand ENERCON E-82n, 2 MW capacity, hub height 138 metres, rotor diameter 82 metres, total height 179 metres, during the period of 22:00 hours to 06:00 hours, at a night emission rate of more than 45 dB(A) that is measurable at the residential building of the plaintiffs in 1) and 2) at 86688 Marxheim, St.-Gertraud-Straße 15.’
Higher Regional Court of Munich, Augsburg, August 14, 2012
Download original document: “Sanders and Rosskopfs versus Bavaria Windpark”
[translated by Simone Gabbay, translator for All Languages, Toronto, Ontario, paid for by a citizen of Ontario]
This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tags: Wind power, Wind energy