LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Turbine 500m ‘visual obstrusion’ barrier 

Credit:  Leinster Express | 19 December 2013 | www.leinsterexpress.ie ~~

New draft government guidelines on the construction of industrial wind turbines have been released for public consideration.

Updates to the 2006 guidelines propose a minimum 500 metre setback from homes, to prevent “visual obtrusion”, and an outdoor noise limit of 40dBA (equivalent to the hum of a refrigerator).

The revisions got a mixed reaction from Laois TDs. They were slammed as “a cosmetic exercise” by Sinn Féin Dep Brian Stanley, but welcomed by Fine Gael’s Charlie Flanagan.

“This will allow those who have stated their concerns up to now to make real and meaningful contributions on the possible impact of wind turbines on their own community, their own home or their own health,” said Dep Flanagan.

He hopes the “legitimate concerns of local communities” are now considered.

“The spread of misinformation throughout rural communities has been both damaging and divisive. This has not been helped by the failure of wind companies to engage properly with communities that raise their concerns,” he added.

However Dep Stanley believes fears will not be allayed.

“This is just a cosmetic exercise which won’t fool those opposed to the erection of these wind farms in their communities and close to their homes. The proposed 500 metre set back distance is totally insufficient and people should not be expected to live in such close proximity to such giant structures. Setback distances should be based on the height of the turbines,” he said.

He says guidelines even if revised are “useless”.

“What we need are statutory regulations which can be enforced in the courts and which include severe sanctions and penalties for breaches of these legal requirements,” he said.

“The government seem determined to impose these wind farms on rural communities and I urge people to make submissions before the deadline. There should be a moratorium on all further planning permissions for wind farms until proper regulations are in place,” he said.

The public can make written submissions on the proposed guidelines up to February 21.

See www.environs.ie for full draft of guidelines.

Source:  Leinster Express | 19 December 2013 | www.leinsterexpress.ie

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky