LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind turbine at Bay Path approved by board 

Credit:  Debbie LaPlaca, www.telegram.com 7 June 2011 ~~

CHARLTON – The Planning Board has approved the installation of a 330-foot wind turbine on the hilltop campus of Bay Path Regional Vocational Technical High School, Superintendent-Director David P. Papagni reported to the school board last night.

“Our goal is still to have a foundation in by late fall and a turbine operating by late spring. The Planning Board is in full favor of our project and we meet all state guidelines,” he told the Southern Worcester County Regional Vocational School Committee.

The Bay Path plan and a proposal by the Overlook Masonic Health Center to erect two turbines near the Charlton town center have been scrutinized in a series of site plan reviews and public hearings. The Planning Board’s authority was limited to upholding town and state regulations for turbine site design, sound levels and shadow flicker.

Sustainable Energy Developments of Ontario, N.Y., the company hired to install both projects, demonstrated all three turbines meet regulations.

Mr. Papagni reported that he will soon seek the Planning Board’s approval to install a 30-foot tall turbine for the school’s new clean energy house.

“This wind turbine is for educational purposes only,” he said.

With operational green energy systems, the house will be used, in part, as a satellite classroom to integrate the latest technologies with traditional trade instruction and train a new workforce of specialized service technicians.

The 24-foot-square, two-story house is presently being constructed by students on school grounds.

Source:  Debbie LaPlaca, www.telegram.com 7 June 2011

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky