Determination of Acoustic Compliance of Wind Farms
Author: | Noise, Technology
Translate: FROM English | TO English
Translate: FROM English | TO English
Abstract: An issue exists around the world of wind farms that comply with permit conditions giving rise to noise complaints. Approval limits are normally expressed in A-weighted levels (dB(A)) external to residential receivers. The distance from the wind farm to residential receivers can result in diffculty in establishing the dB(A) contribution of the wind farm, as the overall noise includes background noise that can provide masking of the wind turbine noise. The determination of the ambient background at a receiver location (without the influence of the wind farm) presents challenges, as the background level varies with the wind and different seasons throughout the year. On-off testing of wind farms does not normally occur at high wind farm output and limits this approach for acoustic compliance testing of a wind farm. The use of a regression analysis method developed more than 20 years ago is questioned. Anomalies with respect to compliance procedures and the regression method of analysis based on real-world experience are discussed.
Steven Cooper and Christopher Chan
The Acoustic Group, South Windsor, Australia
Acoustics 2020, 2, 416–450; doi:10.3390/acoustics2020024
This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this material resides with the author(s). As part of its noncommercial effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.
Wind Watch relies entirely on User Funding |
![]() |
![]() |
Share:
Tags: Wind power, Wind energy