LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Application to increase rotor size for Laois wind turbines 

Credit:  By Eoghan MacConnell | Leinster Express | www.leinsterexpress.ie ~~

A wind farm developer is seeking to increase the size of turbine rotors on a previously approved development in Laois.

Pinewood Wind Limited says it will reduce the turbine hub size so the overall height won’t exceed 136.5 metres, despite the proposed new 117 metre rotor diameter.

The 11 turbine site near Abbeyleix on lands at Graguenahown, Knockardagur, Boleybawn and Ironmills (Kilrush) was approved by An Bord Pleanala in 2019.

The operators are now seeking to “amend the wind farm development permitted under An Bord Pleanála Reference PL11.248518 (Laois County Council Planning Register Reference 16/260) to provide: (i) an increase in the rotor diameter of the wind turbines from 103 metres to 117 metres; (ii) a reduction in the hub height of the wind turbines from 85 metres to 78 metres, thus retaining the permitted overall tip height of the wind turbines of 136.5 metres; (iii) the re-siting of wind turbines T8, T9, and T10 and their associated foundations and crane hardstandings by three metres, 5.5 metres and 10 metres respectively; and (iv) all associated site development, drainage, access and reinstatement works.”

Pinewood stated that: “The planning application is accompanied by an Environmental Impact Assessment Report/Environmental Impact Statement which includes an assessment of the likely effects of the proposed development, as a whole and In combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development, including the infrastructure associated with the wind farm development”.

The planning application is also accompanied by Natura Impact Statement. The plans were submitted to Laois County Council this week. A decision is expected to be made by the council in October.

Source:  By Eoghan MacConnell | Leinster Express | www.leinsterexpress.ie

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky