LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind farm project’s impact on marine mammals to come under scrutiny at hearing 

Credit:  David Hannant: Local democracy reporter | Eastern Daily Press | 05 March 2019 | www.edp24.co.uk ~~

The spotlight will be shone on how a proposed multi-billion pound wind farm could impact on sealife, the shipping industry and traffic this week, as the decision process over it continues.

Danish energy firm Orstead is bidding to build what would be the world’s biggest offshore wind farm off the north Norfolk coast, which would also see a cable corridor dug across the county.

The ambitious project is currently under consideration from the planning inspectorate, in what will be a lengthy process with several individual hearings.

This week, a panel will hear evidence on how the project could impact on a range of matters across three separate hearings, to be held on Wednesday, Thursday and Friday.

The first hearing will centre on how it could affect the ecology of the site, located more than 100km off the coast, including the impact on marine mammals.

The following day will then assess how it could encroach on aviation, shipping and oil and gas operations, before looking into traffic impact at Friday’s hearing.

The latest hearings begin the day after a detailed site visit, which saw the panel visit several locations which could be impacted, including Oulton Airfield, Cawston and a point near Reepham at which proposed cable routes for the Hornsea Three project and a separate proposal from Vattenfall would cross.

Once this week’s hearings have been carried out, further will be conducted later this month before the panel completes its examination of the evidence on Tuesday, April 2.

From this point the panel will have three months to prepare a report before Greg Clarke, secretary of state for business, energy and industrial strategy, is tasked with deciding the application – a process which could take another three months.

It means Orstead will likely not discover the fate of the project until October.

Previous hearings have focussed on the project’s potential impact on other sites across Europe and wildlife onshore.

The three hearings this week are to be held at the Mercure Hotel on Boundary Road in Norwich, starting at 9.30am.

Source:  David Hannant: Local democracy reporter | Eastern Daily Press | 05 March 2019 | www.edp24.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky