LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

State to rebuild 78 miles of power lines from Massena to Croghan 

Credit:  Saturday, July 22, 2017 | northcountrynow.com ~~

MASSENA – The state will rebuild 78 miles of power lines running from the Moses-Saunders Power Dam in Massena to a substation in Croghan in order to send electricity downstate, according to Gov. Andrew Cuomo’s office.

The Smart Path project, when completed, will run north to south through St. Lawrence and Lewis counties carrying hydropower from Massena and power from newly constructed wind farms, solar power projects and other large-scale renewable energy sources, from upstate to high-energy demand areas downstate, Cuomo’s office said.

The newly rebuilt transmission line, called the Moses-Adirondack Smart Path Reliability project, will help the state meet the a mandates from Cuomo that 50 percent of New York’s consumed electricity comes from renewable energy sources like wind and solar by 2030, according to a news release from his office.

The Smart Path project is expected to create approximately 2,000 full-time, well-paying jobs during development and construction, the governor’s office said. All construction is expected to take place on existing rights-of-way in order to minimize the impact on the environment and adjacent property and landowners. Additionally, the project will pursue an expedited permitting approach available to upgrades that do not expand rights-of-way. Construction is estimated to take four years and is slated to begin in 2019, Cuomo said.

The $440 million rebuild of the Moses-Adirondack transmission artery includes replacing 78 of the 86-miles on each of two transmission lines that were originally constructed by the federal government in 1942 and acquired by the Power Authority in 1953. The transmission lines run from Massena in St. Lawrence County, home to NYPA’s St. Lawrence-FDR hydroelectric plant, to a substation in the Town of Croghan in Lewis County. The transmission lines are still supported in many areas by outmoded wooden poles that will be replaced with new steel monopole structures, according to the release.

The new structures and conductors will be capable of transmitting up to 345 kilovolts, but will be operated in the near-term at the current level of 230kV. This ability to increase the voltage when the demand requires is a cost-effective way to unlock more renewable power, especially in-state renewable generation and imports of hydro from Canada, to anywhere along the transmission line, as New York continues to advance its clean energy goals. NYPA worked with transmission owners in New York, including Con Ed, NYSEG, the Long Island Power Authority, National Grid and Central Hudson Gas & Electric, to obtain concurrence on the Smart Path design to support long-term expansion of renewable energy development, Cuomo’s office said.

Source:  Saturday, July 22, 2017 | northcountrynow.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky