LOCATION/TYPE

NEWS HOME



[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

News Watch Home

Conneaut assessing damage from turbine lightning strike 

Credit:  By Mark Todd | Star Beacon | September 28, 2017 | www.starbeacon.com ~~

CONNEAUT – Administrators in Conneaut are assessing damage to the city’s wastewater treatment plant caused by lightning that struck a wind turbine adjacent to the plant early Saturday morning.

The turbine, which supplements electricity used by the sewage plant, lost a blade when lightning hit about 1:30 a.m. Saturday. A power surge penetrated the plant and might have affected some equipment in the building, City Manager James Hockaday said Monday.

“We’re still waiting for a summary,” he said. “There is no cost estimate.”

Chunks of the shattered blade were strewn across a wide area, including Marina Drive, Hockaday said.

The turbine is no stranger to bolts from the blue. In August 2011, a lightning strike damaged a blade that was replaced several months later.

The 400-kilowatt turbine, perched at the edge of Lake Erie, was constructed in January 2010 by its owner, NexGen Energy of Boulder, Colorado. A 10-year contract obliges the city to purchase energy from NexGen for the plant for a 10-year period that expires in 2020.

NexGen’s turbine provides about 20 percent of the power used at the plant, officials have said. An email sent to NexGen on seeking comment was not immediately returned Monday.

Another NexGen wind turbine, a 600-kilowatt model adjacent to Conneaut Middle School on Gateway Avenue, has been idle for years. NexGen is suing the manufacturer, alleging parts were defective. The turbine, designed to provide electricity to CMS, never performed as planned since it went online in late 2009, according to the lawsuit, filed in 2013.

Repairs to the school turbine won’t happen until the lawsuit is settled, NexGen officials have said.

Source:  By Mark Todd | Star Beacon | September 28, 2017 | www.starbeacon.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky