LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

MoD’s radar fears over planned turbine 

Credit:  Leighton Buzzard Observer | 01 June 2016 | www.leightonbuzzardonline.co.uk ~~

The Ministry of Defence has issued concerns about proposals for a second 490ft wind turbine on the edge of Heath and Reach.

After being contacted by agents Engena Ltd regarding the proposed turbine at Checkley Wood Farm, the MoD wrote back that they “may have concerns” regarding the application.

MoD safeguarding assistant Michael Billings said: “Your development will be detectable by, one or more MoD radars.

“As a consequence, we may object should you proceed with a planning application for the development in its current form.”

The Checkley Wood turbine would be 74km from the air traffic control radars at RAF Wittering, and according to the MoD, and would be detectable by it.

Mr Billings went on: “Wind turbines have been shown to have detrimental effects on the performance of MoD air traffic control and range control radars.

“The desensitisation of radar could result in aircraft not being detected by the radar and therefore not presented to air traffic controllers.”

In addition, the MoD stated the turbine could interfere with military low flying training, which usually takes place down to a height of 250ft above ground level.

The MoD adds: “Regardless of whether we object to your proposal, it is probable the MoD will request the turbine(s) be fitted with visible or infra-red aviation safety lighting.”

Heath and Reach Parish Council has yet to formulate its response to the planning application, but a meeting was held at Heath and Reach Barn on Thursday, May 26, in order for gauge public opinion.

Already, an action group is forming against the proposed turbine, lead by Chris Roberts who promised to “respond vigorously to counter the application” once it was submitted.

An extensive objection document has also been prepared.

Source:  Leighton Buzzard Observer | 01 June 2016 | www.leightonbuzzardonline.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky