LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Engineering works at the Kentish Flats wind farm disturb residents in Whitstable and Herne Bay 

Credit:  By Dan Wright | Kent Business | 18 May 2015 | www.kentonline.co.uk ~~

Wind farm bosses have apologised for noise created as they install turbines overnight, saying the noise will be over by the end of the week.
Neighbours in Whitstable and Herne Bay have complained of loud bangs caused by temporary engineering works at the Kentish Flats wind farm.

But bosses say the noise – made by piling foundations into the seabed – will stop when the work is completed.

The wind farm, owned by Swedish energy company Vattenfall, is currently undergoing a £150 million extension with 15 new turbines set to be built.

Vattenfall spokesman Jason Ormiston said: “Vattenfall was contacted at the weekend by a number of local residents about noise caused by temporary engineering works taking place 8km off Herne Bay and Whitstable.

“At the start of May we began installation of 15 wind turbines to extend our Kentish Flats Offshore Wind Farm by piling foundations into the seabed.

“We’re sorry that some residents have been disturbed by this activity.”

The wind turbines are expected to be completed this summer and will form part of the only wind farm construction offshore in UK waters this year.

It increases the size of the 30-turbine farm, which has been operational since 2005, by 50%.

Once complete it will be able to generate enough electricity to power 35,000 homes a year .

Mr Ormiston added: “Whilst we do all we can to minimise noise from piling operations, if and when we pile at night it’s possible that residents will hear noise for up to an hour.

“At this point in time, Vattenfall and its contractors have piled 11 of 15, 250 tonne foundations, 30 metres into the seabed.

“When piling work has been completed – probably by the end of this week – there will be no more noise from offshore construction activity.”

Source:  By Dan Wright | Kent Business | 18 May 2015 | www.kentonline.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Complaints


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky