LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

New proposals for Kirkby Moor wind farm revealed 

Credit:  The Westmorland Gazette | 27 October 2014 | www.thewestmorlandgazette.co.uk ~~

The latest plans for the proposed re-powering of Kirkby Moor wind farm in Furness have been revealed.

The existing wind farm, built in 1993, was one of the first generation of wind turbines in the UK. Just 4km from Ulverston, it consists of 12 turbines.

Now, operator RWE Innogy UK is proposing to upgrade the turbines to provide “a more productive” wind farm.

The company says it has listened to local feedback and “taken on board” results of studies and is proposing a revised project of six turbines.

Due to improvements in wind turbine efficiency however, the proposed “re-plant” could still generate more energy. The proposed installed capacity is between 12MW and 18MW. That is enough electricity to power between an estimated 9,600 and 12,600 average UK homes.

Chris Gainey, RWE Innogy Developer, said: “We already know that Kirkby Moor is a good site to locate a wind farm. Modern technology has moved on significantly since the existing turbines were installed and the project we are proposing would make use of new and more productive technologies while increasing the amount of renewable energy it could generate.”

This increase in capacity would also mean an increase in the community funding which would mean a windfall of between £1.2 million and £1.8 million across the lifetime of the project, subject to the final installed capacity of the project. It is likely that this would be delivered through annual payments of £60,000 to £90,000 each year the wind farm operates, these would become available when the project becomes is fully operational and index linked in line with inflation.

RWE Innogy UK is now finalising its plans with a view to submitting a formal planning application to South Lakeland District Council towards the end of this year.

Updates will continue to be provided as the application progresses. For more information about the wind farm visit: www.rweinnogy.com/kirkbymoorreplant

Source:  The Westmorland Gazette | 27 October 2014 | www.thewestmorlandgazette.co.uk

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky