Wind Watch is a registered educational charity, founded in 2005. |
Turbine bid fails
Credit: By Anwen Humfrey | Tivy-Side Advertiser | 22nd August 2014 | www.tivysideadvertiser.co.uk ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
A bid to build two 77 metre tall wind turbines near Llanfyrnach has failed, after a planning inspector ruled they would harm the character and appearance of the surrounding landscape.
Cwm Arian Renewable Energy was last year refused planning permission by Pembrokeshire County Council to build the turbines at Trefawr Farm.
At a recent appeal hearing against the decision, planning inspector Sian Worden was told the structures would only be four kilometres from the eleven turbines which comprise the wind farm at Dyffryn Brodyn but would be taller.
In dismissing the appeal, she said the proposed turbines would stand near the top of a fairly steep slope facing Llanfyrnach and would appear “large and dominant.”
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tag: Victories |