LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Many new power lines planed 

Credit:  The Belmond Independent | August 15, 2013 | www.belmondnews.com ~~

Clean Line Energy announced the route for its proposed DC power transmission line. Only about eight miles of the Rock Island line will lie in Hancock County. It will come out of Wright County about 1.5 miles southwest of Kanawha, turn west, and travel eight miles to Kossuth County, continuing west several more counties. A pubic meeting will be held August 22 in Belmond.

Meetings were held in Northwood and Lake Mills to talk about another new power line that will carry electricity from nearby windfarms. The line, smaller than the proposed 600 kilovolt (DC) Rock Island Clean Line project north of Belmond, would be constructed of single steel poles placed about 1,000 feet apart.

ITC, the company that now owns the present 68kV transmission lines to and from Belmond, is in the middle of a 17-part, 345kV (AC) power line upgrade in 11 states. The ITC upgrade includes a line from Jackson to Blue Earth, MN and then south to Ledyard, Burt and Algona. At Ledyard, another line will travel east through Winnebago County (north of Lake Mills) then turn south in Worth County (west of Northwood) and travel past Mason City on the way to Hampton. This line will eventually interconnect with a new Mid-American Energy line from Hampton to Cedar Falls. MidAmerican has also proposed a new line along Highway 18 from Sheldon to Algona and south to Fort Dodge. It will interconnect with the ITC project at a point northeast of Algona.

The ITC and MidAmerican projects will likely cross under the Rock Island Clean Lines in Kossuth and Franklin Counties.

Source:  The Belmond Independent | August 15, 2013 | www.belmondnews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky