LOCATION/TYPE

NEWS HOME



[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

It’s time to halt the wind scam 

Credit:  Times Argus | January 12, 2013 | www.timesargus.com ~~

Ponder the ramifications of this if you will. I’m going to start a power company in Ira. I will source a year’s worth of the projected power required from a dam set up on a currently dry drainage that comes down off Herrick Mountain.

I am quite sure that we will get one good storm this year which will create a torrent that when harnessed for a day will meet our power needs for the year. We will keep track of the power produced and in essence pay forward the cost of power that we require from the grid for the rest of the year. You might question if the torrent of power that we produce on that day will actually get used.

Nope. Our grid manager wasn’t completely sure this power was coming and thus didn’t scale back the big base load producers of energy. This doesn’t matter to me; my power company will take the credit for this unused energy and use that credit to keep Ira’s lights on for the rest of the year. Who pays for energy we used over the rest of the year? Not Ira. We have a credit. You know who pays – everybody else.

Did you know that common sense and legal precedent don’t allow other generators to get away with this type of operation? Hydro-Quebec couldn’t. Vermont Yankee couldn’t. They have to be available 24/7/365 to sell their power into the market. They are required to be reliable, forecastable and stable. Then there is industrial wind, which works just like my sham of a dam up on Herrick. Wildly unstable, variable and inefficient, but for some ratepayer ripoff of a reason, regardless of the time of day or the need for energy, always first to sell power that won’t get used into the market. If you can’t trust a wind turbine enough to shut down the other generators, you are not using the wind. Crazy? You bet, but we’re destroying mountains and neighbors’ lives for this debacle.

Four wind projects are already shamming the Vermont ratepayer (Sheffield, Lowell, Georgia Mountain, Searsburg), and Windham/Grafton, Deerfield, Grandpa’s Knob, Brighton/Newark/Ferdinand are in the works.

Don’t leave this to someone else. Call your representatives and tell them it is time to support the moratorium on industrial wind in Vermont.

Justin Turco

Ira

Source:  Times Argus | January 12, 2013 | www.timesargus.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky