[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Minister delays decision on Uni wind turbines  

Credit:  Coleraine Times | www.colerainetimes.co.uk 3 July 2012 ~~

A decision on two new wind turbines at the University of Ulster in Coleraine has been delayed by the Minister following a late objection.

In a letter to Coleraine Borough Council, Minister Alex Attwood said he had reviewed the application and was satisfied that Planners had made the right decision in approving the scheme.

He said that he appreciated residents’ concerns regarding the proximity of the turbines to their homes however, he said, Coleraine Council’s own Environmental Health department had been consulted and had suggested conditions to mitigate noise nuisance.

“The Department will also include a condition on the approval to mitigate against shadow flicker nuisance,” said Minister Attwood.

“The University advised the Department that in the development of the scheme the University fully considered the site constraints including neighbouring dwellings, university academic buildings and residents, the existing campus wind turbine generator, roadways and the AONB designate area.

“The University also advised that the wind turbine generator site locations were optimised to provide least impact given the site constraints and that there is no opportunity to relocate the turbines to 500 metres from all dwellings.

“The proposed wind turbine generators are at a distance from the nearest local dwellings which is similar to that of the existing campus wind turbine and noise readings taken by Coleraine Borough Council at the nearest dwelling have been found to be within designated levels.”

Minister Attwood added, however, that he had instructed his officials to delay issuing an approval decision notice as a late objection had been submitted.

“This must be carefully considered before a final decision is issued,” he said.

He said that, should this objection be considered to be of sufficient weight to alter the opinion of the Department, Council’s Planning Committee would be informed.

Source:  Coleraine Times | www.colerainetimes.co.uk 3 July 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter