LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]




Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Quebec-Vermont wind turbine dispute threatens to become international incident 

Credit:  By Caroline d’Astous, www.huffingtonpost.ca 3 May 2012 ~~

A Quebec town on the Vermont border is threatening to shut off the water supply to a neighbouring American town if a plan to build windmills on the U.S. side goes ahead.

The mayor of Stanstead, a town in the Eastern Townships that controls the water serving the U.S. town of Derby Line, has said he would shut off the water valves if two wind turbines are installed just outside the limits of his town, on the American side.

“This is not a municipal council decision, but it is a measure I am proposing so that we can be heard,” Mayor Philippe Dutil said in a phone interview.

Dutil is furious. A few weeks ago, citizens and local elected officials learned that the company Encore Redevelopment, based in Burlington, planned to install wind turbines near the Canada-U.S. border.

It turns out the Americans intended to install the windmills only a few metres from the residential area of the Canadian town, but far from the houses on the U.S. zone, the mayor explained. Stanstead residents are outraged.

“They (Encore Redevelopment) want to build two wind turbines only 150 metres away from about 50 or so houses, the Stanstead Mayor declared, while on the American side, there are no houses within at least six kilometers from the proposed location of the wind turbines.”

It is a critique shared by both of the area’s elected officials. “It doesn’t look like [the American company] took into account the fact that there was a city on the other side of the border,” claimed Pierre Reid, the provincial Liberal member for Orford.

“This situation must not create a precedent where we end up with wind turbines all along the Canada-US border,” added federal New Democratic Party (NDP) member for Compton, Jean Rousseau.

Not In My Country

According to officials, the two wind turbines could pose a safety risk for residents on the Canadian side, on top of driving down property values.

“There is real danger for the residents, because the wind turbines would be right on the edge of a residential neighborhood,” warned the NDP’s Rousseau, who is also worried about the ice that could form on the turbines’ rotor blades in winter.

The mayor has expressed concern for certain species of migratory birds that come through the area each year during their migration south. It is a situation he claims the American company is already aware of.

“The American company is prepared to collect dead birds on the American side. But not if they fall on our side of the border,” said Mr. Dutil.

These arguments are contested by Encore Redevelopment.

“There is a lot of false information circulating among the public about the project, and we are taking very seriously the claims about a possible impact on public health,” stated Chad Farrell, principal of the company, in an email sent to Huffington Post Quebec.

“The fact is that the wind turbines have been installed safely all over the world in locations very similar to our project in Derby Line, without any problems whatsoever. Modern wind turbines are silent, safe, and in the case of this project, provide farmers with an additional source of revenue,” he added.

International Incident?

Stanstead’s elected officials want to open a dialogue with Vermont authorities and the Vermont Public Service Board.

“We are in the process of scrutinizing all the existing treaties between Quebec and Vermont to find channels of communication,” Rousseau explained, indicating that he hoped there would be no need to involve American authorities in Washington.

As for the provincial member, Mr. Reid, he said he has called on the Minister of Intergovernmental Affairs to help obtain an audience with the Vermont Public Service Board, and also sent a letter on April 30th to the U.S. company detailing the Canadian side’s concerns.

• 150-metre windmills will be installed on the U.S. side of the border.

• This is the foundation of a home currently under construction on the Quebec side. Windmill turbines will be located 240 metres from here, about half the usual minimum distance.

• The mayor of Stanstead, Philippe Dutil, with citizens protesting the construction of windmills.

Source:  By Caroline d’Astous, www.huffingtonpost.ca 3 May 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon