[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

No cause for turbine fire  

Credit:  MIRANDA ORSO, Press-Republican, pressrepublican.com 31 January 2012 ~~

ALTONA – Monday, officials from Noble Environmental Power were still trying to determine the cause of a wind-turbine fire that broke out Saturday evening at the Altona Wind Park.

John Bahouth, vice president of human resources and communications, said the company was working to mobilize heavy equipment to the area in order to reach the top of the extremely tall turbine.

“We are pursuing the cause with all diligence, and as soon as the company knows more details, we will be issuing another press release with the findings,” Bahouth said.

He said there was no way to say exactly when the company would know what caused the blaze.

The damage was confined to the turbine and posed no risks to nearby residents or businesses.

PAST TOWER COLLAPSE

This was the second major incident involving wind turbines in the Altona Park.

A power outage on March 6, 2009, triggered a fire when Turbine 42 did not move into safe mode. The rotor and blades whipped up to three times the speed for which the system was designed, according to a report from the Public Service Commission, and the tower collapsed.

Oil in the nacelle of the turbine caught fire, and the unit was heavily damaged.

Turbine 59 was also damaged when it, too, didn’t kick into safe mode.

NOT NOBLE’S FAULT

In a report issued in October 2010, the Public Service Commission found no fault with Noble, concluding the facilities had “been inspected and maintained in accordance with the manufacturer’s recommendations.”

The commission also said Noble was in compliance with procedures for inspection, maintenance, public safety and site security.

“The commission is encouraged by the steps that Noble has taken to implement robust site control and internal reporting and scheduling procedures subsequent to the Altona turbine failure investigation,” Chairman Garry Brown said in a news release at that time.

As well, the Service Commission said the turbine manufacturer had put in place product and process improvements “to preclude a repetition of the circumstances that led to the incident.”

— News Editor Suzanne Moore contributed to this report

Source:  MIRANDA ORSO, Press-Republican, pressrepublican.com 31 January 2012

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter