Wind Watch is a registered educational charity, founded in 2005. |
Wind farm hearing told of peat landslide fears
Credit: Anne Lucey, www.irishtimes.com 16 November 2011 ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
An oral hearing into a proposal for a wind farm near Castleisland, Co Kerry, heard yesterday how the applicants proposed locating large turbines in existing forestry rather than blanket bog to prevent the possibility of a peat landslide.
The site of wind turbines proposed by Saorgus Energy Ltd was also in the flight path to Kerry airport, 15km away, and this was one of the reasons it had been turned down by the local authority, yesterday’s proceedings were told.
A representative of the Irish Aviation Authority said the farm would not affect the safety of normal commercial flights. Kerry airport, however, said this would be the only wind farm in the direct path of their airport and the turbines should not be allowed.
The 730-hectare site stretching to the Cork and west Limerick borders was zoned “open for consideration” rather than suitable in the Kerry County Council development plan, flagging the fact that it had certain sensitivities.
Within it were “dual conservation areas” for birds and animals and nearby was an area of special conservation. The proposed farm at Cordal was 15km from the airport exclusion zone at Kerry airport. Aviation safety – because of the site’s proximity to Kerry airport – as well as environmental issues had led to Kerry County Council refusing to grant the application earlier this year.
It is the fourth application by Saorgus Energy. Permission was granted in 1999 for a smaller wind farm on blanket bogland and subsequent applications were to extend the number of wind turbines. Permission still exists for 11 turbines on blanket bog.
Concerns were raised about the stability of the bog and the possibility of landslide, about the effect on protected blanket bog habitat and the hen harrier, and the effects of sediment from construction on rivers and roads.
Saorgus engineer Kevin Harty said the peat depth varied from 10mm to three metres and the turbines would not be sited in the deeper bog, making the risk of a slide “negligible”. A decision will be published on January 6th.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: