[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]


LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

DNR Approves Synergics’ Roth Rock Wind Facility  

Last week the Maryland Department of Natural Resources recommended that Synergics Energy Services be allowed to construct its proposed Roth Rock wind turbine facility along the ridgeline of Backbone Mountain. The agency made its recommendation to the Maryland Public Service Commission (PSC), which has the final authority to grant or deny permission for the 40 megawatt project, consisting of between 15 and 20 turbines, to proceed. The PSC's final decision is expected by the end of the year.

Last week the Maryland Department of Natural Resources recommended that Synergics Energy Services be allowed to construct its proposed Roth Rock wind turbine facility along the ridgeline of Backbone Mountain. The agency made its recommendation to the Maryland Public Service Commission (PSC), which has the final authority to grant or deny permission for the 40 megawatt project, consisting of between 15 and 20 turbines, to  proceed. The PSC’s final decision is expected by the end of the year.
In its initial finding of April 20, DNR indicated that it would likely approve the project, although several unfinished studies would have to be completed and reviewed prior to the agency issuing its recommendation. Those studies included a  nesting bird survey emphasizing species of concern; vegetation and wetlands studies; and evaluations of impacts to approximately 50 Maryland Inventory of Historic Properties located within two miles of the project site.
In last week’s letter to the PSC signed by DNR Secretary C. Ronald Franks, the agency said those studies had been completed, and gave its approval for the project with the qualification that several turbines in the initial proposal are situated at sites not suitable for construction. The 10 turbines originally planned for those sections have been moved to different locations within the project site, and several have been eliminated from the company’s proposal.
Franks also stipulated that post-construction studies of bird and bat kills be undertaken at the site, and if the numbers are determined to be excessive the wind company will be required to greatly curtail production during time periods of highest risk, such as the annual fall migration.
The PSC case record for the Synergics application, including the DNR approval, may be viewed on the commission’s web site at www.psc.state.md.us/psc, under Case 9008

http://www.therepublicannews.com/article.asp?id=857

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter