Wind Watch is a registered educational charity, founded in 2005. |
Update on Lincoln, Wisconsin, wind projects
Translate: FROM English | TO English
Translate: FROM English | TO English
The following document summarizes some of the problems the Moratorium Committee faced in trying to address problems the township hadn’t faced prior to turbine construction and some of the resulting changes the committee proposed as a result of its study. The committee met 39 times between January 17, 2000, and January 20, 2002 …
Download original document: “Excerpts and Update from the Final Report of the Township of Lincoln”
This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tags: Wind power, Wind energy