Sign up for daily updates

Help keep this education resource going strong!

More information

News Watch

Selected Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Issues/Locations

Documents Home
View PDF, DOC, PPT, and XLS files on line
RSS

Add NWW documents to your site (click here)

Update on Lincoln, Wisconsin, wind projects  

Author: 

The following document summarizes some of the problems the Moratorium Committee faced in trying to address problems the township hadn’t faced prior to turbine construction and some of the resulting changes the committee proposed as a result of its study. The committee met 39 times between January 17, 2000, and January 20, 2002 ...

Download original document: “Excerpts and Update from the Final Report of the Township of Lincoln”

This article is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

Get the Facts
HOME ABOUT PRIVACY CONTACT DONATE
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Formerly at windwatch.org.

Follow Wind Watch on Twitter

Wind Watch on Facebook

Share