List all documents, ordered … By Title | By Author
Resource Documents: Ontario (92 items)
Unless indicated otherwise, documents presented here are not the product of nor are they necessarily endorsed by National Wind Watch. These resource documents are shared here to assist anyone wishing to research the issue of industrial wind power and the impacts of its development. The information should be evaluated by each reader to come to their own conclusions about the many areas of debate. • The copyrights reside with the sources indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations.
Before–after field study of effects of wind turbine noise on polysomnographic sleep parameters
Author: Jalali, Leila; Bigelow, Philip; et al.
Introduction: ‘Sleep, a natural behavioral state and a vital part of every individual’s life, involves distinct characteristics and many vital physiological changes in the body’s organs that are fundamental for physical and mental health. The physiological processes involve protein biosynthesis, excretion of specific hormones, and memory consolidation, all of which prepare the individual for the next wake period. Fragmented and insufficient sleep can adversely affect general health impacting daytime alertness and performance, quality of life, and health, and potentially lead . . .
More »Revocation of Renewable Energy Approval for Ostrander Point Wind Park
Author: Environmental Review Tribunal, Ontario
Decision delivered by Heather I. Gibbs and Robert V. Wright – The Director, Ministry of the Environment and Climate Change (the “Director”) issued a renewable energy approval (the “REA”) on December 20, 2012, to Ostrander Point GP Inc. as general partner for and on behalf of Ostrander Point Wind Energy LP (“Ostrander”) to install nine wind turbine generators, with a total installed nameplate capacity of 22.5 megawatts, and supporting facilities (the “Project”) on the Ostrander Point Crown Land Block (the “Site”). . . .
More »Analysis of the Economic Impacts of the wpd Fairview Wind Project on the Collingwood Regional Airport and the Regional Economy
Author: Malone Given Parsons; Cormier, Charles; Metro Economics; and Aerocan Aviation
In short, we conclude that the Collingwood Regional Airport is fulfilling its intended function as an economic engine and is attracting business expansion proposals that would deliver very substantial economic benefit to the South Georgian Bay region. Approval of the current wpd Turbine Project would be fatal to business expansion, such that, on balance, the offending turbines should be moved or wpd’s Renewable Energy Act Application denied. January 8, 2016 Prepared By: MALONE GIVEN PARSONS LTD. In Association With: Charles . . .
More »Ontario’s Electricity Dilemma – Achieving Low Emissions at Reasonable Electricity Rates
Author: Ontario Society of Professional Engineers
Original Goals for Electricity System Transformation Reduce CO₂ emissions from power plants: Phase out coal plants and build new efficient CCGT gas plants. Restart 4 nuclear units at Bruce A and 2 units at Pickering A. Add wind, solar, bio-energy and small hydro generation. Refurbish nuclear units as they reach end of design life. Create new green energy sector jobs: FIT program to accelerate deployment of renewables. Create 50,000 jobs in new green sector. Keep transformation costs within 1% per . . .
More »