Cullerin Range wind farm survey follow-up
Cullerin Range Wind Farm was developed by Epuron and transferred to Origin who completed construction and operation began in July 2009. The wind farm consists of 15 2MW REpower turbines, each tower reaching to around 80 metres with turbine blades of 46 metres [total height 414 feet]. Local residents have complained of noise and other disturbing impacts from the wind farm since operation began in July 2009. The Cullerin Range Wind Farm Survey from August 2012 found a large percentage of . . . Complete article »
Schneider, Patina
Cullerin Range Wind Farm Survey, August 2012
Key Findings: 73% of all residences out to 5km returned the survey with 85.7% of households indicating that noise is present at their residence and property during the day and/or night, with 78.5% of households reporting sleep disturbance from the noise generated by the wind energy development. 70.8% of all residences out to 7.5km returned the survey with 82.4% of households indicating noise is present at their residence and property during the day and/or night, with 76% of households reporting . . . Complete article »
Also try:
Search all of documents for "Schneider, Patina".
Search entire site for "Schneider, Patina".