LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Gujarat’s Samana set to become wind power hub 

Ahmedabad: Samana in Gujarat’s Rajkot district is set to become a major hub of wind power energy in the country as energy companies like China Light Power (CLP) and Tata Power have pledged to invest up to Rs.8.15 billion ($189.5 million) in different projects in the area.

CLP, through its India subsidiary CLP India, is investing close to Rs.5 billion for installing 126 wind turbines in Samana that will generate 100.8 MW power.

Tata Power has installed wind turbines in the same area for generating 50 MW power at a cost of Rs.3.15 billion.

Both projects are expected to become operational by early next year, according to government sources.

The Gujarat government, which is banking heavily on wind power, has identified Samana as an ideal location for installation of 450 turbines that can generate a total of 360 MW.

To encourage investment in wind energy development in the state, the government has introduced a raft of incentives including a higher wind energy tariff.

Sources in Gujarat Energy Development Agency (GEDA) confirmed that Samana is the location for both CLP and Tata Power projects. Samana is a large area and could accommodate more than one project, the sources said.

Samana has a high tension transmission grid and electricity generated by wind turbines can be fed into it. For this purpose, a substation at Sadodar has been installed.

Both projects are being executed by Enercon, a joint venture between Enercon of Germany and Mumbai-based Mehra group.

Both CLP and Tata Power are also setting up wind power projects in Karnataka. While the CLP is putting up a project at Saundatti, Tata Power’s project will come up at Gadag, about 80 km from Hubli.

siliconindia.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky