Resource Documents by GE Energy
GE Energy
Effects of integrating wind power on transmission system planning, reliability, and operations.
Prepared for: THE NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY (NYSERDA) Albany, NY John Saintcross, Senior Project Manager Prepared by: GE ENERGY ENERGY CONSULTING Richard Piwko, Project Manager Xinggang Bai, Kara Clark, Gary Jordan, Nicholas Miller, Joy Zimberlin March 4, 2005 Download original document: “THE EFFECTS OF INTEGRATING WIND POWER ON TRANSMISSION SYSTEMS” Complete article »
GE Energy
Ice Shedding and Ice Throw — Risk and Mitigation
By David Wahl and Philippe Giguere This brief industry paper specifies a minimum setback of 1.5 times the tower height plus the rotor diameter (not radius) from any occupied structure, road, or public use area for safety from ice throw. Site-specific conditions may require a greater distance. Download original document: “Ice Shedding and Ice Throw – Risk and Mitigation” Complete article »
Also try:
Search all of documents for "GE Energy".
Search entire site for "GE Energy".