Go to multi-category search Â»

ISSUES/LOCATIONS

View titles only
(by date)
List all documents, ordered…

By Title

By Author

View PDF, DOC, PPT, and XLS files on line
RSS

Add NWW documents to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

News Watch

Selected Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Resource Documents by Calumet County, Wis., Board of Supervisors

Calumet County, Wis., Board of Supervisors
Amendments to Calumet County, Wis., ordinance
These amendments concerning noise and setbacks from wind energy systems were approved into law on March 18, 2008. Includes thorough guidelines for pre- and post-construction noise measurements and estimates of impact from wind turbines. “The audible sound emitted by Wind Energy System operations shall not be greater than 5 dBA above the background noise level (L90) for the quietest period of the day measured during the pre-build noise study.” “No low frequency sound or infrasound from wind energy system operations . . . Complete article »

Also try:
Search all of documents for "Calumet County, Wis., Board of Supervisors".
Search entire site for "Calumet County, Wis., Board of Supervisors".

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: