National Wind Watch Picture Gallery

Click to view full size image

Lifting the rotor assembly

Lifting of the complete equipped rotor, with a diameter of 71 m, at the Dargel├╝z wind farm, in the German federal state of Mecklenburg-Vorpommern. Three Enercon installations of the type E-70/4 were assembled by the crane. When the rotor and its blades were lifted, the crane went to an outreach of 23 m with a load of 53 tons on the hook.

image002.jpg image007.jpg Liebherr-LR1600.jpg netherlands-offshore.jpg TX-Jordan-Stewart.jpg
File information
Filename:Liebherr-LR1600.jpg
Album name:windros9 / Photos
Filesize:94 KiB
Date added:Jun 29, 2011
Dimensions:595 x 850 pixels
Displayed:666 times
URL:https://wind-watch.org/pix/displayimage.php?pid=605
Favorites:Add to Favorites
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: