National Wind Watch Picture Gallery

Click to view full size image

The Terminator

Advertisement for the Tesmec 1475 trench digger ("a 100 MW wind project could have up to 150,000 feet of trenches containing 450,000 feet of underground cables" -- North American Windpower, March 2009)

Barry_Wind_Turbine_Comic_StripnLow_Res.jpg DK-prodn-co2.gif terminator.jpg final_wco_gradient11.png alternative_energy_revolution.jpg
File information
Filename:terminator.jpg
Date added:Mar 29, 2009
URL:https://wind-watch.org/pix/displayimage.php?pid=509  |  short URLs:  https://wind-watch.org/pix/509 | http://wndfo.net/P509
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: