June 10, 2016
Law, Poland, Press releases, Setbacks

Polish Parliament adopts mandatory setback – 10 times turbine height – for industrial wind turbines

stopwiatrakom.eu

On 9 June Polish Senate approved the bill providing for mandatory setbacks of new wind farm developments from residential housing, which had already been passed by the Lower House several weeks ago. To become law, the legislation must now be signed by Polish President Andrzej Duda and officially published. The law is expected to come into effect as from 1 July 2016. This new regulation affects rural communities in a number of important ways:

It needs to be noted that this legislation does not provide for the liquidation of any existing wind farms, does not affect in any way the current operation of these plants or the public subsidy system for industrial wind energy.

A recent report by the Polish National Auditor (NIK) analysed the failure to safeguard the public interest in local planning and approval processes for wind farms. Based on a multiyear inquiry covering 70 local and county level authorities, the report identified massive conflicts of interest (wind farms being sited on lands owned by local officials approving the projects), other widespread violation of local government laws, the lack of proper measurement of sound emissions from wind farms, and failures to properly consult with local communities about the projects.

The Polish Public Health Institute (PIZP-PZH) issued a recommendation that wind farms should be located at least 2 kilometres from people’s residences, citing a comprehensive review of current scientific publications (close to 500 items) and the precautionary principle that is part of the EU law.

10 June 2016 – editors of stopwiatrakom.eu, a national online platform for safe wind turbine setbacks from homes


URL to article:  https://www.wind-watch.org/alerts/2016/06/10/polish-parliament-adopts-mandatory-setback-10-times-turbine-height-for-industrial-wind-turbines/