September 27, 2006
Impacts, Wisconsin

Update on Lincoln, Wisconsin, wind projects

Bittner-Mackin, Elise

The following document summarizes some of the problems the Moratorium Committee faced in trying to address problems the township hadn’t faced prior to turbine construction and some of the resulting changes the committee proposed as a result of its study. The committee met 39 times between January 17, 2000, and January 20, 2002 …

Download original document: “Excerpts and Update from the Final Report of the Township of Lincoln [1]


URL to article:  https://www.wind-watch.org/documents/update-on-lincoln-wisconsin-wind-projects/


URLs in this post:

[1] Excerpts and Update from the Final Report of the Township of Lincoln: https://docs.wind-watch.org/update-from-lincoln.doc