Just over 3,750,000 lbs of rebar in 66 Wind Turbine foundations were installed. Each octagon shaped foundation included a bottom mat, top mat, and column pedestal. Location: Ransom, Illinois. Completed: March 2008
http://www.jbsteel.com/index.php/photos/album/32.html
URL to article: https://www.wind-watch.org/documents/steel-in-grand-ridge-wind-farm/