Ice Shedding and Ice Throw — Risk and Mitigation

GE Energy

By David Wahl and Philippe Giguere

This brief industry paper specifies a minimum setback of 1.5 times the tower height plus the rotor diameter (not radius) from any occupied structure, road, or public use area for safety from ice throw. Site-specific conditions may require a greater distance.