February 12, 2008
Filings, Siting, Wales

Appeal Decision, Rhos Garn Whilgarn, Tagarreg, Llandysul, Ceredigion

Wild, Stuart

The appeal is made by RES Developments Limited against the decision of Ceredigion County Council. The application Ref A050648, dated 8/06/05, was refused by notice dated 20/09/06. The development proposed is a 10 turbine wind farm and associated electrical transformers, sub-station and control building, 60m anemometer mast and infrastructure for a period of 25 years.

Decision: The appeal is dismissed. (Date 07/02/08)

Main issues: In my view the main issues in this case are the effect of the proposal on the character and appearance of the area, and the effect on residential amenity.

Download original document: “Appeal Decision, Rhos Garn Whilgarn, Tagarreg, Llandysul, Ceredigion [1]


URL to article:  https://www.wind-watch.org/documents/appeal-decision-rhos-garn-whilgarn-tagarreg-llandysul-ceredigion/


URLs in this post:

[1] Appeal Decision, Rhos Garn Whilgarn, Tagarreg, Llandysul, Ceredigion: https://docs.wind-watch.org/1200875-rhos-garn.pdf