Accelerated depreciation: Difference between revisions

From Wind Watch Wiki
Jump to navigation Jump to search
(Created page with "Another federal tax break in the USA available to wind, in addition to the Production tax credit, is provided by the “Modified Accelerated Cost-Recovery System” establ...")
 
No edit summary
Line 1: Line 1:
Another federal tax break in the USA available to wind, in addition to the [[Production tax credit]], is provided by the “Modified Accelerated Cost-Recovery System” established in 1986. Utility-scale wind projects can be depreciated over an accelerated schedule of 5 years.[http://programs.dsireusa.org/system/program/detail/676]
Another federal tax break in the USA available to wind power investors, in addition to the [[Production tax credit]], is provided by the “Modified Accelerated Cost-Recovery System” established in 1986. Utility-scale wind projects can be depreciated over an accelerated schedule of 5 years.[http://programs.dsireusa.org/system/program/detail/676]


Since 2008, wind projects could also claim “bonus” depreciation, a “special depreciation allowance”, of 50% in the first year that they are placed in service.[https://www.irs.gov/pub/irs-pdf/i4562.pdf] In 2018 it is 40%, and in 2019 30%.[http://programs.dsireusa.org/system/program/detail/676] Projects acquired and placed in service in 2011 were eligible for 100% “additional first-year depreciation deduction”.[https://www.irs.gov/pub/irs-drop/rp-11-26.pdf]
Since 2008, wind projects could also claim “bonus” depreciation, a “special depreciation allowance”, of 50% in the first year that they are placed in service.[https://www.irs.gov/pub/irs-pdf/i4562.pdf] In 2018 it is 40%, and in 2019 30%.[http://programs.dsireusa.org/system/program/detail/676] Projects acquired and placed in service in 2011 were eligible for 100% “additional first-year depreciation deduction”.[https://www.irs.gov/pub/irs-drop/rp-11-26.pdf]

Revision as of 17:05, 2 December 2017

Another federal tax break in the USA available to wind power investors, in addition to the Production tax credit, is provided by the “Modified Accelerated Cost-Recovery System” established in 1986. Utility-scale wind projects can be depreciated over an accelerated schedule of 5 years.[1]

Since 2008, wind projects could also claim “bonus” depreciation, a “special depreciation allowance”, of 50% in the first year that they are placed in service.[2] In 2018 it is 40%, and in 2019 30%.[3] Projects acquired and placed in service in 2011 were eligible for 100% “additional first-year depreciation deduction”.[4]