National Wind Watch Picture Gallery

Click to view full size image

Lifting the rotor assembly

Lifting of the complete equipped rotor, with a diameter of 71 m, at the Dargel├╝z wind farm, in the German federal state of Mecklenburg-Vorpommern. Three Enercon installations of the type E-70/4 were assembled by the crane. When the rotor and its blades were lifted, the crane went to an outreach of 23 m with a load of 53 tons on the hook.

File information
Filename:Liebherr-LR1600.jpg
Album name:windros9 / Photos
Date added:Jun 29, 2011
URL:https://wind-watch.org/pix/displayimage.php?pid=605  |  short URLs:  https://wind-watch.org/pix/605 | http://wndfo.net/P605
Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: