National Wind Watch Picture Gallery

850 files in 3 albums with 0 comments viewed 991,050 times
Photos


Motvind-Sverige.jpg

723 files, last one added on Sep 02, 2021
Album viewed 14387 times

Graphics


rotor-sizes-Vestas.png

123 files, last one added on Sep 10, 2021
Album viewed 9734 times

Videos


magdeburg-windrad-brennt.avi

4 files, last one added on Mar 16, 2019
Album viewed 1572 times

 

3 albums on 1 page(s)

Latest additions
rotor-sizes-Vestas.png
Wind turbine rotor diameters over time - graphic from VestasSep 10, 2021
Motvind-Sverige.jpg
Remains of a forest in SwedenPhoto by courtesy of Motvind SverigeSep 02, 2021
Upper-Kergord-Shetland-converter-station.jpeg
Converter station, Upper Kergord, ShetlandConverter station for wind energy facility, Upper Kergord, Shetland - photo by courtesy of Save ShetlandJun 08, 2021
IA-Gamesa-oil.jpg
Oil stains from nacelle and blade hubGamesa 2-MW turbine in the "Top of Iowa II" facility grimed with oil stains - photo by Julie Kuntz, Feb. 28, 2021Mar 02, 2021

Random files
KewauneeWindFarm.jpg
Lincoln Township, Kewaunee County, WisconsinWisconsin Public Service’s 14-turbine project in Lincoln Township in Kewaunee County include these five turbines. The 9-megawatt project was completed in 1999. [These are 660-kilowatt Vestas V-47 models, tower height 213 feet, total height 290 feet.] - Gina Duwe, Janesville Gazette.
TeApitiNZ.jpg
New ZealandNew Zealand
Manitoba-StLeon1.jpg
St. Leon, Manitoba, Canada - the nearest turbine is 800 meters (one-half mile) from the houseSt. Leon, Manitoba, Canada - the nearest turbine is 800 meters (one-half mile) from the house
France-Cast-construction.jpg
Cast, FranceCast, France
REpower_5M_Beatrice_5.jpg
Construction of RE Power 5-MW wind turbine: hoisting the nacelleConstruction of RE Power 5-MW wind turbine: hoisting the nacelle (gearbox and generator housing)
Barry-Renewable_Ate_IrreplacableWEB.jpg
The Renewable That Ate the IrreplaceableThe Renewable That Ate the Irreplaceable: “You are the renewable that keeps us dependent on the grid” - from beat poodle Fred Milton, by courtesy of Lynda Barry
NY-Churubusco-substation_ChristinneMuschiNYT.JPG
Substation for wind turbines, Churubusco, New YorkSubstation for wind turbines, Churubusco, New York - Christinne Muschi, New York Times
manif_K.jpg
Second national demonstration against industrial wind energy, Paris, France, Oct. 4, 2008Second national demonstration against industrial wind energy, Paris, France, Oct. 4, 2008 - Collectif du 4 octobre, collectif.4.octobre.free.fr

Note:  The copyrights of the images presented here reside with their indicated creators, not National Wind Watch. Any reuse of these images must consider those copyrights. Their use here has not always been specifically authorized or licensed by the copyright owner. As an educational nonprofit, National Wind Watch endeavors to observe "fair use" as provided for in section 107 of U.S. Copyright Law and similar "fair dealing" provisions of the copyright laws of other nations. The images are made available here for educational purposes to illustrate the environmental, social, scientific, and economic issues of large-scale wind power development. Send queries to Wind Watch via e-mail.
Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: