LOCATION/TYPE

NEWS HOME


[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Wind measurement tower could mean future wind turbine in northwest DeKalb County; Public hearing June 12 in Sycamore 

Credit:  By Camden Lazenby · June 04, 2025 at shawlocal.com ~~

A request by a Lowell, Massachusetts–based company with a Chicago office could mean an altered skyline in northwest DeKalb County, near Clare, according to DeKalb County documents.

A public hearing regarding a special-use permit request for a temporary wind measurement tower on property west of Clare Road, between Schafer and Malta roads, will be held at 1 p.m. June 12 in the east conference of room of the DeKalb County Administration Building, 110 E. Sycamore St., Sycamore, according to a public notice from the DeKalb County Community Development Department.

A picture of a wind measurement tower was included in a special use application submitted to DeKalb County. (Camden Lazenby)

If the applicants receive county approval, an estimated 197-foot wind measurement tower will be installed on property owned by Laurence Smith and Barbara Jo Koehnke, according to county documents.

The special-use permit application also was submitted by a limited liability company called Clare Wind 2, overseen by New Leaf Energy, which has an office at 180 N. LaSalle St., Chicago.

Lydia Lake was listed as the application’s primary contact.

The wind measurement tower, which would be a singular steel pole supported by guy wires, would be installed for at least a year but for no more than 18 months, according to the application.

The temporary installation would be constructed at a distance of at least 1½ times its height away from other structures. Lights and moving parts would not be incorporated, according to the application.

Although the tower wouldn’t produce energy and would be temporary, it would provide valuable insight into whether the location is viable for a wind turbine, which could have a decades-long lifespan.

“The [wind measurement tower] is an investigatory tool to evaluate wind speeds,” according to the application. “It has several measuring devices along it to measure wind speeds to determine if a wind turbine would be suitable in this specific location.”

Source:  By Camden Lazenby · June 04, 2025 at shawlocal.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI BS M TS TG Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Bluesky Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab