LOCATION/TYPE

NEWS HOME
(Latest News)



[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

FAQs

Research Links

Selected Documents

Campaign Material

VIDEOS

Photos & Graphics

Store

ALLIES

Wind Watch is a user-supported educational charity, founded in 2005.

• News Watch Home •

Second Siemens Gamesa blade breaks off turbine at Swedish wind farm 

Credit:  Cosmo Sanderson · Published 15 January 2025 · rechargenews.com ~~

A second Siemens Gamesa 5.X blade in a matter of months has broken off a turbine at a Swedish onshore wind farm, resulting in 51 further turbines being shut down at the site.

The blade on the SG 5.8-170 turbine broke at the 372MW Bjornberget wind farm in the north of Sweden.

The break was discovered on 7 January and the wind farm’s operator RES Group confirmed it has since shut down 51 of the 60 turbines at the site. The other nine have been kept online as they feature blades from a different manufacturer.

“An investigation has been launched, and we will be thoroughly analysing its results,” said a spokesperson. “We are working to resolve this situation as soon as possible. We remain committed to maintaining transparency and ensuring the safety of our operations.”

A Siemens Gamesa spokesperson told Recharge that “no one was harmed and a safety zone has been established around the turbine”.

“We are investigating the cause of this incident and are in constant communication with our customers, suppliers and local authorities to ensure safety for technicians and the public.”

The incident comes hot on the heels of another blade break at the same site in November, an investigation for which reportedly remains ongoing.

The Bjornberget wind farm is owned by German asset manager Prime Capital and Israeli power producer Enlight.
The 2020 order Siemens Gamesa landed to supply the Bjornberget project was the largest it had received at that time for its 5.X platform.

Siemens Gamesa was thrown into crisis in 2023 when serial defects emerged in its 4.X and 5.X platforms, with the largest portion of the technical problems concerning the rotor blades and main bearings.

The OEM said it expected to spend €1.6bn fixing quality problems with the turbines. It returned the 4.X model to the market last year.

[rest of article available at source]

Source:  Cosmo Sanderson · Published 15 January 2025 · rechargenews.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI BS M TS TG Share

Tag: Accidents


• News Watch Home •

Get the Facts
CONTACT • DONATE • PRIVACY • ABOUT • SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Bluesky Wind Watch on Mastodon Wind Watch on Truth Social