LOCATION/TYPE

NEWS HOME



[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]

Archive
RSS

Add NWW headlines to your site (click here)

WHAT TO DO
when your community is targeted

Get weekly updates
RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Man dies in met-mast accident at site of massive Queensland wind project 

Credit:  Sophie Vorrath · Apr 26, 2024 · reneweconomy.com.au ~~

A man has died in a workplace accident at the site of the proposed Proserpine wind farm, a 900MW project that is in the very early stages of development on Gia People Country in Queensland’s Whitsunday Region.

It is understood that the man, a worker in his 30s, was killed on Thursday after falling roughly 20 metres from a meteorological mast – a tower used to measure the wind characteristics at a proposed project generation site (similar to the picture above).

Media reports have suggested the man fell when the met-mast collapsed (although some had mistakenly identified it as a turbine), but a spokesperson from Proserpine wind farm said on Friday that investigators are still working to determine the cause of the tragic accident.

“We are shocked and saddened to learn of the death of a contractor at the project site in Proserpine,” the spokesperson said in a statement emailed to Renew Economy.

“Staff are currently on site working with authorities and supporting family and colleagues.

“Our thoughts and condolences are with the contractor’s family at this very difficult time.”

Renewable Energy Partners announced its plans for the huge Queensland wind farm roughly two years ago, which it proposes to build in two 450MW stages.

The company is behind the “Battery of the North” – up to 1400MW and eight hours of pumped hydro storage planned for inland from Mackay – is also looking at a four hour big battery to be built next to the Proserpine wind farm, possibly sized at 100MW/400MWh.

Source:  Sophie Vorrath · Apr 26, 2024 · reneweconomy.com.au

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Contributions
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky