Wind Watch is a registered educational charity, founded in 2005. |
Grand Forks County drops wind farm moratorium
Credit: By Doug Barrett | KNOX | June 23, 2022 | knoxradio.com ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
The Grand Forks County Commission has lifted a moratorium on wind farm applications after tweaking a series of local siting requirements.
The revised document includes moving the setback for wind turbines from one-quarter to one-half mile. The changes also define the tower height setback from property lines and right-of-ways. Another provision involves the so-called shadow flicker – or the amount of time rotating wind blades can cast shadows on nearby dwellings. The max time would be 30 hours per year – or an average of five minutes per day.
The revisions are designed to alleviate concerns shared by property owners and those in the wind farm industry. The 90 day moratorium was scheduled to run out in early July.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: