Wind Watch is a registered educational charity, founded in 2005. |
West Cumbrian wind farm lifespan extensions applications made
Credit: By Tom Coleman, Reporter | News & Star | www.newsandstar.co.uk ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
Requests have been made to extend the life of two Cumbrian wind farms.
Allerdale Council are currently considering requests to extend the operational lifespan of Siddick Wind Farm in Siddick, and Oldside Wind Farm in Oldside.
Both wind farms are owned by Curlew Power Limited.
Siddick Wind Farm is made up of seven turbines, while Oldside Wind Farm is made up of nine.
The applications, which have been submitted separately, request approval for the extension of the turbines’ lifespan by an additional 10 years.
If approved, this would result in Siddick Wind Farm having permission to operate until the end of December 2031, and give Oldside Wind Farm permission to operate until the end of September 2031.
The planning applications to extend both lifespans do not require a change in the physical appearance of the turbines, or any changes to the site arrangements or wind farm operations.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Funding |
(via Stripe) |
(via Paypal) |
Share: