Wind Watch is a registered educational charity, founded in 2005. |
Plans for 12-turbine windfarm north of Listowel
Credit: The Kerryman | October 07 2020 | www.independent.ie ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
A windfarm company has been told it must apply directly to An Bord Pleanála for planning permission to erect 12 150m-high turbines on peatland between Listowel and Ballylongford as the proposed development would constitute a strategic infrastructure development.
An Bord Pleanála ruled that the Shronowen Wind Farm plan – with a power output of 50.4MW and slated for the townlands of Tullamore, Ballyline West, Dromlivaun and Coolkeragh – ‘constitutes development that falls within the definition of energy infrastructure’ due to its size, scale and location.
An Bord also ruled that the proposal would be of strategic importance by the requirements of the Planning and Development Act, meaning the file will have to go straight to An Bord Pleanála rather than through Kerry County Council.
An Bord revealed that the site is ‘primarily situated’ across flat peatland where ‘some’ non-commercial turf-cutting continues.
The blade height would be just six metres lower than the massive turbines that are mooted for Finuge.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
![]() (via Stripe) |
![]() (via Paypal) |
Share: