LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Draft EIR available for wind-energy project in eastern Shasta County 

Last summer, a citizens’ group that opposes the project had asked the county to place a moratorium on any more large generation projects. Citizens in Opposition to the Fountain Wind Project said the nearly 38,000-acre forested area that the turbines would be located within is in a high fire hazard zone.

Credit:  Damon Arthur and Nada Atieh | Redding Record Searchlight | Aug. 5, 2020 | www.redding.com ~~

The draft environmental impact report for a controversial wind-energy project in eastern Shasta County has been published.

The public has until 5 p.m. Sept. 18 to comment on the environmental document.

ConnectGen wants to build the project, called Fountain Wind, on nearly 4,500 acres six miles west of Burney and one mile west of the existing Hatchet Ridge wind project.

The new wind turbine proposal would be on leased timberland near the communities of Montgomery Creek, Round Mountain, Oak Run, Moose Camp, Big Bend and Wengler.

Per the draft EIR, Fountain Wind would feature up to 72 wind turbines that could be as high as 679 feet – higher than Shasta Dam. The project would have a maximum generating capacity of 216 megawatts, enough to power more than 200,000 homes, according to a formula from the Lawrence Livermore Labs.

Last summer, a citizens’ group that opposes the project had asked the county to place a moratorium on any more large generation projects.

Citizens in Opposition to the Fountain Wind Project said the nearly 38,000-acre forested area that the turbines would be located within is in a high fire hazard zone.

Paul Hellman, the county’s director of resource management, said he does not know when the project would come before the Planning Commission for final approval. The project would go before the Board of Supervisors if the commission’s decision is appealed.

“It’s really too early to predict that,” Hellman said of a Planning Commission date. “Once we receive all the comments, we will have to evaluate them, prepare responses, and we really don’t know until we see the magnitude of comments” how long that will take.

Source:  Damon Arthur and Nada Atieh | Redding Record Searchlight | Aug. 5, 2020 | www.redding.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky