[ exact phrase in "" • ~10 sec • results by date ]

[ Google-powered • results by relevance ]


Go to multi-category search »

LOCATION/TYPE

News Home
Archive
RSS

Subscribe to RSS feed

Add NWW headlines to your site (click here)

Sign up for daily updates

Keep Wind Watch online and independent!

Donate $10

Donate $5

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Publications & Products

Photos & Graphics

Videos

Allied Groups

Lincoln Land Wind sees first proposed case with FAA, sends notices for partner project in Macoupin  

Credit:  By Benjamin Cox | WLDS | February 2, 2020 | wlds.com ~~

The Lincoln Land Wind Project sent a proposed wind turbine structure on January 27th to the FAA. The structure is proposed to be cited south of Alexander and the structure is proposed to be 791 feet tall, well outside of the range of the 660-foot limit by the Morgan County WECS ordinance. Lincoln Land Wind has yet to ask for their permits from the Morgan County Zoning Board of Appeals, which was established in early January after some lengthy debates on the title and operation of the zoning board by some local residents and the Morgan County Commissioners. The proposed case for the FAA can be seen at this link.

The Journal Courier reports that Apex Clean Energy is now looking to expand their footprint with a separate project in the northern portions of Macoupin County near Modesto, Scottville, and Virden. The project calls for up to 80 turbines along the northern Macoupin County line. The new project will be called the Lotus Wind Project. The Journal Courier reports that Lotus Wind has set up temporary offices in Virden and have begun contacting area landowners for possible interest. At this time, Macoupin County does not have any ordinances or resolutions regulating wind projects. Lotus Wind is expected to go online in 2023 for a 200 megawatt wind farm.

Macoupin County Board members report to the Journal Courier that Lotus Wind staff are slated to attend the county’s next Economic Development Committee meeting on Thursday and the regularly scheduled County Board Meeting.

Source:  By Benjamin Cox | WLDS | February 2, 2020 | wlds.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
Donate $5 PayPal Donate

Share:


News Watch Home

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

 Follow: