Wind Watch is a registered educational charity, founded in 2005. |
Rampion offshore wind farm shut down for more than a week
Credit: BBC News | 7 November 2019 | www.bbc.co.uk ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
A £1bn offshore wind farm has been out of action for more than a week.
The Rampion project, off the Sussex coast between Brighton and Worthing, has been shut down since 26 October due to a fault in an electrical distribution system.
Power for about 350,000 homes is generated from the farm’s 116 turbines, which were opened in November 2018.
The outage would have “no impact on energy supply” in the area, the National Grid said.
The wind farm’s operators said it was “in the process” of repairing the fault and the system would be “up and running again as soon as possible”.
“National Grid are responsible for managing the supply of electricity and ensuring that there is no loss of electricity supply to the local area as and when the wind farm is shut down,” it said.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tag: Accidents |