Wind Watch is a registered educational charity, founded in 2005. |
Council delay decision on proposed increase in height for wind turbines in Offaly
Credit: Offaly Express | 15 Oct 2019 | www.offalyexpress.ie ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
Offaly Council is seeking further information before making a decision on a proposed increase in height for wind turbines in the county.
Gaeltech Energy Developments Cloghan Ltd applied for permission to amend a previously granted permission for the development at Steonestown, Kilcamin, Crancreagh and Derrinlough.
The company is seeking to increase the overall height of the wind turbines from 150 metres to 169 metres. It is also seeking to realign wind farm access tracks and underground cabling and increase the maximum height of a meteorological mast to 100.5 metres.
The original permission for the development from Offaly County Council (REF: 14/188) allowed for the construction of nine wind turbines on the site.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share: