LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]


Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Stripe

Donate via Paypal

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Antrim Wind project fined for delay 

Credit:  By Abbe Hamilton | Mondanock Ledger-Transcript | 9/16/2019 | www.ledgertranscript.com ~~

The Antrim Wind project is slated for completion by the end of November, despite setbacks caused by a supplier’s bankruptcy and a recent malfunction of the temporary safety lights atop the turbines.

Selectman John Robertson said on Tuesday that representatives for the project confirmed that the temporary lights weren’t working after a resident reported an outage at the Sept 9 Select Board meeting.

The Federal Aviation Administration requires lights on any structure taller than 200 feet to have lights, in order to identify potential hazards to air navigation. Robertson said the company filed the proper paperwork with the FAA following the malfunction and scheduled a repair of the lights for Monday, Sept 16.

The temporary lights will remain on the turbines until permanent lights are installed. According to Robertson, the project missed its original deadline of Aug. 30 because of a problem with sourcing the permanent lights. He said the company that had been contracted to provide the lights went bankrupt over the winter and failed to notify TransAlta until April or May. Robertson acknowledged that there were fairly limited alternative providers.

“It takes quite a long time to get those once you order them,” he said, describing the setback as “one of those things that happens.”

Robertson said that TransAlta paid the Town of Antrim $50,000 for the delay. In the original contract with the town, TransAlta agreed to pay the fee if the turbines weren’t on line within twelve months after the start of construction.

“I think things are back where they’re supposed to be, the lights have been ordered from somewhere else and they’ll be in sometime in the next month,” Robertson said.

Town officials believed the project was on track as of July. Nine turbines will ultimately generate power on Tuttle Hill and Willard Mountain.

A recent Twitter post from energy company TransAlta said the array will be capable of producing 28.8 megawatts of power.

Source:  By Abbe Hamilton | Mondanock Ledger-Transcript | 9/16/2019 | www.ledgertranscript.com

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Stripe
(via Stripe)
Donate via Paypal
(via Paypal)

Share:

e-mail X FB LI M TG TS G Share


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky