Wind Watch is a registered educational charity, founded in 2005. |
St. Cloud VA wind turbine to be demolished in July
Credit: Alex Svejkovsky | WJON | wjon.com ~~
Translate: FROM English | TO English
Translate: FROM English | TO English
ST. CLOUD – The wind turbine on the St. Cloud VA campus will be coming down later this summer.
VA Spokesman Barry Venable says demolition will take place July 15th through the 24th and cost over $326,000 to remove.
Last year, the St. Cloud VA commissioned a study to look at whether the turbine could be repaired or destroyed. In the end, the cost of trying to fix the turbine outweighed its potential energy savings.
Venable says they hired a contractor for the removal, who will recycle or reuse most of the turbine components.
The turbine was built in 2011 and never produced any energy for the VA.
This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.
The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.
Wind Watch relies entirely on User Contributions |
(via Stripe) |
(via Paypal) |
Share:
Tag: Accidents |