LOCATION/TYPE

NEWS HOME

[ exact phrase in "" • results by date ]

[ Google-powered • results by relevance ]



Archive
RSS

Add NWW headlines to your site (click here)

Get weekly updates

WHAT TO DO
when your community is targeted

RSS

RSS feeds and more

Keep Wind Watch online and independent!

Donate via Paypal

Donate via Stripe

Selected Documents

All Documents

Research Links

Alerts

Press Releases

FAQs

Campaign Material

Photos & Graphics

Videos

Allied Groups

Wind Watch is a registered educational charity, founded in 2005.

News Watch Home

Fire forces wind farm halt; Investigation into blaze at Ravenshoe project 

Credit:  Andrea Falvo | The Cairns Post | November 15, 2018 | ~~

A far North Queensland wind farm has been temporarily shut down while investigations into what sparked a turbine to catch fire at the site this week are carried out.

Fire crews were called to the Windy Hill wind farm near Ravenshoe at about 3pm on Tuesday, with emergency services quickly establishing an excludion zone.

It is understood the fire was contained within a turbine nacelle, the cover housing the generating components.

No injuries to Ratch Australia Corporation staff, TWPS personnel or the public were reported.

[See photos at earlier story.]

Ratch has begun an investigation into the blaze at the company’s wind farm.

Company spokesman Simon Greenacre said it would likely take several weeks to get to the bottom of the cause of the fire, which lasted just over an hour.

Investigations will be carried out by Ratch technicians.

“We’re eager to confirm the cause as we’ve experienced 18 years of operation without incident,” Mr Greenacre said.

“We have temporarily shut down the wind farm while we conduct a thorough investigation of all the turbines.”

Mr Greenacre said that while turbine design life was 20 to 25 years, the turbines were well serviced and any electrical componentry was replaced as required.

“We maintain our assets to the highest standards,” he said.

“Our findings will hopefully support us in reducing the risk of it happening again.”

Mr Greenacre assured local communities that there would be no interruption to electricity supply.

Windy Hill was the first wind farm to be constructed in Queensland.

Construction of the 20-turbine wind farm started in 1999 with the turbine commissioning in 2000.

Source:  Andrea Falvo | The Cairns Post | November 15, 2018 |

This article is the work of the source indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this article resides with the author or publisher indicated. As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Send requests to excerpt, general inquiries, and comments via e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI TG TG Share

Tag: Accidents


News Watch Home

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook

Wind Watch on Linked In Wind Watch on Mastodon